Secure
Each connection is given a unique encapsulation ID
to create an ePipe that encapsulates all data and runs
across TPG's private backbone.
| Parameter | Specifications |
|---|---|
| Configuration | Point-to-point or point-to-multipoint |
| Transport Technology | MPLS Core with various Access technologies/clear transmission |
| Access Networks | Fibre400 Mid-Band Ethernet Ethernet over SDH Ethernet over Fibre Third party Ethernet |
| Bandwidth | 2Mbps-10Gbps Bandwidth will depend on the Access speed |
| MPLS CoS Options | Standard: best effort delivery Business: assured delivery Carrier: expedited forwarding with end-to-end latency, jitter and packet loss performance contract |
| Ethernet Frame Size (MTU)1 | Business and Carrier: Fast Ethernet interfaces: 1531 bytes Gigabit Ethernet interfaces: 8960 bytes 10 Gigabit Ethernet interfaces: 8960 bytes Standard: 1526 bytes |
| VLAN Transparency1 | Business and Carrier: customer VLANs are supported transparently2 Standard: some limitations apply, contact TPG |
| Protocol Transparency1 & 3 | Business and Carrier: Layer 2/3 supported transparently2 Standard: some limitations apply, contact TPG |
| QoS Transparency | TPG does not adhere to, nor modify customer assigned priority bits (802.1p/DSCP) |
| Site Requirements | Rack space (1RU) and 240V AC 50Hz power to be provided by the Customer |
| Security | Ethernet VLL ePipe based on RFC 4447 and RFC 4448 |
| Reporting Access Availability and Performance Reporting |
Carrier: Access availability and performance reporting, RFC2544 compliance test report at service handover Business: Access availability and performance reporting Standard: some limitations apply, contact TPG |
| Contract Terms | Minimum contract term is 12 months. Longer contract terms (e.g. 24 months, 36 months and longer) are available and attract term discounts. |
| Provisioning Targets | Installation (<1Gbps): TPG fibred building or Mid-Band Ethernet exchange - 20 working days Modification: physical changes - 20 working days logical changes - 5 working days |
| Outage Restoration Targets1 | Metro: 4 hours Regional: next business day |
| MEF Certification | MEF 1.0 (MEF 9 and 14) listed under TPG subsidiary AAPT |
Please complete the form below, required fields are indicated with an asterisk.